Seawolf Nuclear Submarines choose Kundel Cranes

Jun 29, 2016 | Cranes

Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane.  The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine.  Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.

Invest in Kundel Trench Boxes

Construction companies face numerous challenges, with safety being a top priority. Digging trenches is a common part of construction work, but it can also be dangerous. That's where trench boxes come in, creating a safer work environment for those in the trenches. In...

The Role of Aluminum Trench Shoring in Trench Safety

Construction companies deal with a variety of hazards every day in their operations, some of which are inherent to the nature of their work. One of these hazards is trenching, where a number of construction workers lose their lives every year. Occupational Safety and...