Over the weekend, we had a SnapTrac 1/2 ton placed in a private garage. Looks great and customer was more than happy to have it installed in less than 3 hours.
The “Drag-Ahead” Technique: Increasing Pipe Installation Cycles with KUNDEL Titan Trench Boxes
On a production pipe job, the trench box should not slow the crew down. The cycle is simple: excavate, lay pipe, pull the box ahead, backfill, and repeat. But when crews are dragging a trench box that is not designed for forward movement, every pull creates more...
