I will tell you that it works amazingly, we had a seven-foot-deep trench that was completely saturated, there was muddy debris caving off the walls before we installed the shoring, and it performed perfectly!
Recent Posts
- Renting vs. Buying Hydraulic Shoring Equipment: Cost Analysis for Contractors
- America’s Water Infrastructure Needs Are Growing. Is Your Trench Safety Plan Ready?
- How to Build a Business Case for Lift Assist Devices: ROI Framework for Plant Managers
- Cast Sockets vs. Welded Sockets: Why the Spreader Socket Decides Trench Box Life
- Understanding Tabulated Data for Aluminum Hydraulic Shoring: A Contractor’s Guide