Here we see a truck loaded with a couple of trench boxes and a stone box. They are headed to one of Kundel’s top dealers; Heckmann Sales & Leasing. A couple of Kundel’s dealers have over $1 million in inventory to keep contractors supplied w/the boxes needed for their jobs.
The “Drag-Ahead” Technique: Increasing Pipe Installation Cycles with KUNDEL Titan Trench Boxes
On a production pipe job, the trench box should not slow the crew down. The cycle is simple: excavate, lay pipe, pull the box ahead, backfill, and repeat. But when crews are dragging a trench box that is not designed for forward movement, every pull creates more...
