Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane. The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine. Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.
Trench Safety Can’t Wait, Plan Now to Stay on Schedule
6–8 Week Lead Times: Don’t Let the Shop Schedule Wreck Yours Jobs don’t wait. Neither should you. Aluminum and steel trench boxes are moving at 6–8 weeks lead time on smaller orders, and that window can slam shut fast when the shop fills up. Larger orders? Let’s nail...