Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane. The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine. Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.
Master Every Move: The Titan Grabber’s Role in Safer, Faster Trench Work
Whether you're a seasoned contractor or just getting started, one question always arises: What’s the best way to move, position, and secure a trench box safely? The answer lies in the right trench box accessories. While trench boxes themselves provide essential...