Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane. The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine. Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.
3 Overhead Crane Issues Holding You Back And How to Fix Them
Overhead cranes are indispensable tools for material handling, but even the most seasoned experts recognize the challenges that can affect productivity and safety. Here are three common issues and effective solutions: 1. Wire Rope Degradation Wire ropes endure immense...