Seawolf Nuclear Submarines choose Kundel Cranes

Jun 29, 2016 | Cranes

Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane.  The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine.  Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.

Trench Safety Checklist: Supplies and Equipment You Need

In construction and excavation projects, the safety of workers in trenches is paramount. To mitigate risks and ensure a secure work environment, it is crucial to understand trench safety requirements, OSHA regulations, and more. In this article, we'll cover the...