Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane. The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine. Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.
Kundel Shorelite Lite: The Easy to Build Aluminum Trench Box
Are you tired of wasting time and money on heavy, complicated trench boxes that take forever to assemble? The Kundel Shorelite Lite is your solution. This modular, aluminum trench box is perfect for any construction project, from spot repairs to larger jobs. Not only...