Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane. The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine. Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.
Why the KUNDEL KTRAC?
If you’ve been around cranes long enough, you know the routine: plenty of systems can move a load from point A to B, but they all come with quirks you learn to work around. Wasted space overhead. Push/pull that leaves you sore. Maintenance calls that show up like...