Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane. The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine. Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.
Urban Excavation Checklist: 5 Things to Look for in a Shoring System
Urban excavation has a habit of humbling the wrong equipment. A trench can look manageable on the print, then turn complicated the second the street narrows, utilities stack up, or the crew loses room to work. That is why the best shoring system for city jobs is not...