Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane. The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine. Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.
The Low-Disruption, High-Impact Automation Move That Pays Back Fast
(How KUNDEL’s K-TRAC, I-STRUT, and Lift-Assist Systems Raise Throughput Without Overhauling Your Floor) Why Semi-Automation Is the Upgrade Most Shops Say “Yes” To Shops turn to semi-automation because it addresses problems that show up every single shift: Operators...
