Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane. The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine. Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.
Titan Basic 3: The Trench Shield That Shows Up When It Counts
Built for the Work That Doesn’t Wait Spot repairs. Utility taps. Broken mains. These aren’t jobs you plan—they're the ones that call at 5 a.m. And if you're the crew responsible for fixing it fast and fixing it right, you need gear that shows up the same way you do:...