Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane. The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine. Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.
The Trench Safety Strategy Cities Are Using to Stretch Their New-Year Budgets (Without Adding More Equipment or Headaches)
Every city enters a new budget cycle with the same challenge: do more with the same dollars. Or in many cases, fewer. Public works directors, infrastructure managers, and utility supervisors are under pressure to modernize systems, reduce downtime, and respond faster...