Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane. The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine. Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.
TrenchJack™: Ditch the Dirt Fights, Win the Deadline Wars
Tough Jobs Need Tougher Gear Let's be honest, trench work isn't for the faint of heart. You need gear that's as tough as you are. TrenchJack™ isn't just another shoring system; it's engineered to handle the grind. So, forget the safety spiel. We're diving into the...