Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane. The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine. Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.
A Smarter Way to Add Automation (One Step at a Time)
Most shops want to automate more, but the truth is… nobody wakes up and says, “Let’s overhaul our whole line this quarter.” Budgets don’t work like that. Production schedules don’t slow down. And crews need solutions that help them today, not two years from now. So...
