Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane. The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine. Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.
The Lift Assist You Need Is Already Here
Around here, “six to eight weeks” isn’t an answer. When your crew’s on the job, they can’t wait. That’s why we keep Quick-Lift Arms and Pillars on the shelf, stocked and ready to ship today. We’re a family company. We believe in doing right by people. That means when...