Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane. The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine. Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.
Why the Industry Is Calling KUNDEL the “Swiss Army Knife of Shoring”
Talk to anyone who’s spent enough time in the trench, and they’ll tell you the ground has a mind of its own. You plan, you prep, and then something shifts. That’s the nature of the work. What you can control, though, is the gear you bring with you. So when crews talk...