Recently Seawolf came to Rhino Assemblies looking for a light-duty workstation crane to install over their existing Konecranes top running crane. The crane was to be used for installing the 30 ft tall dome on top of the Seawolf Nuclear Submarine. Rhino Assemblies chose Kundel due to the complications of the installation and the elevation that the Kundel Crane system was able to achieve utilizing Kundel’s internal wireless electric system so that no festooning cords would be allowed to hang down into the work area.
Deep Trenching Safety: Best Practices for Stacking Trench Boxes
Deep trench work does not reward shortcuts. When excavations reach 16, 20, or more feet deep, crews often need to stack trench boxes to create a protected work zone for sewer, utility, and heavy civil applications. On paper, the concept is simple: place one trench...